Adequate ventilation is required
Ventilation should provide appropriate indoor air quality and control moisture while taking account of the building and its use.
Ventilation requirements in Northern Ireland are set by the Building Regulations (Northern Ireland) and supported by Technical Booklet K. England’s Approved Document F is not the applicable guidance for Northern Ireland projects.
This page is a homeowner-friendly overview. A specific design must be assessed against the building, the proposed work and the current requirements.
Technical Booklet K provides guidance supporting regulations 65, 66 and 68, which set requirements for ventilation in Northern Ireland.
Ventilation should provide appropriate indoor air quality and control moisture while taking account of the building and its use.
Following a Technical Booklet can create a presumption of compliance, but a different approach may be used if compliance is demonstrated to the district council.
The relevant council’s Building Control service reviews the proposed work. It has the final decision on whether the project satisfies the Building Regulations.
Technical Booklet K describes more than one ventilation approach. The correct strategy depends on the design, airtightness, layout and type of work.
Building Control may consider the property type, airtightness, existing extract fans, background ventilators, proposed airflow rates, combustion appliances, fire safety, room layout and the scope of the work. New homes and major alterations normally need a coordinated ventilation design rather than a single product decision.
Read how Positive Input Ventilation moves air through a home, compare our Nuaire Drimaster and wall-mounted PIV systems, or see the ventilation FAQs.
DryHome Ventilation can explain the proposed PIV installation and provide product information, but we cannot approve a design or confirm that work complies with the Building Regulations. Approval and enforcement sit with the relevant council’s Building Control service. Always ask Building Control when a regulatory decision is required.
Use the online suitability check for an initial PIV recommendation, or contact us directly. Neither route replaces advice from Building Control where approval is required.